- High-side voltage
- 345 kV
- Low-side voltage
- 34.5 kV
- Listed quantity
- 1
132 kV high side / 33 / 33 kV low side
New and unused. The listed 250 MVA, 132/33–33 kV ratings follow the technical datasheet and approved dimensional drawing. The supplied nameplate is marked IN WORK and contains conflicting power, voltage, cooling and insulation values. Review the nameplate differences and transcription.
Document images from the supplied PDFs. Select an image to enlarge it. All three original documents are attached to this listing.





The supplied rating-plate drawing is marked IN WORK. Its main rating table lists 91/135 MVA and 110/15 kV, while its separate HV tap schedule has a 132 kV neutral position and 1,093.5 A in the ONAF column. These fields do not agree within the plate. The listing uses the 250/125/125 MVA, 132/33/33 kV design stated in the technical datasheet and approved dimensional drawing. A final, corrected unit-specific nameplate is required to resolve these differences.
| Field | Technical datasheet | IN WORK nameplate main table |
|---|---|---|
| Rated power | HV / LV1 / LV2: 250 / 125 / 125 MVA | HV and LV1–LV2 columns each show 91,000 kVA ONAN / 135,000 kVA ONAF |
| Rated voltage | HV / LV1 / LV2: 132 / 33 / 33 kV | HV: 110 kV; LV1–LV2: 15 kV |
| Cooling | ONAN (75%) / ODAN (100%) | ONAN / ONAF |
| Oil / winding temperature rise | 60 / 70 K; hot spot 78 K | 58 / 63 K; hot spot not stated |
| HV insulation, Um / AC / impulse | 145 / 230 / 550 kV | 123 / 230 / 550 kV |
| HV-neutral insulation, Um / AC / impulse | 145 / 230 / 550 kV | — / 230 / 550 kV |
| LV1 / LV2 insulation, Um / AC / impulse | 36 / 70 / 170 kV | 17.5 / 38 / 95 kV |
Values below reproduce the supplied IN WORK plate. An asterisk means the value has not been entered; a dash is retained where shown.
| Cooling | HV power | LV1–LV2 power | HV voltage | LV1–LV2 voltage | HV current, pos. 1 / 11 / 21 | LV1–LV2 current |
|---|---|---|---|---|---|---|
| ONAN | 91,000 kVA | 91,000 kVA | 110,000 V | 15,000 V | 415.3 / 477.6 / 561.9 A | 1,751.3 A |
| ONAF | 135,000 kVA | 135,000 kVA | 110,000 V | 15,000 V | 616.1 / 708.6 / 833.6 A | 2,598.1 A |
| Winding | Um | LI/CW | AC |
|---|---|---|---|
| HV | 123 | 550 | 230 |
| HV-N | — | 550 | 230 |
| LV1 / LV2 | 17.5 | 95 | 38 |
The plate shows positions 1–25 plus 13A and 13B. The neutral voltage is 132,000 V; the endpoints are 159,720 and 104,280 V. ONAN and ONAF are the column labels printed on this plate. They differ from the datasheet cooling designation.
| Position | Voltage, V | Current ONAN, A | Current ONAF, A | Selector | Pre-selector |
|---|---|---|---|---|---|
| 1 | 159,720 | 677.8 | 903.7 | 1 | K+ |
| 2 | 157,410 | 687.7 | 917.0 | 2 | K+ |
| 3 | 155,100 | 698.0 | 930.6 | 3 | K+ |
| 4 | 152,790 | 708.5 | 944.7 | 4 | K+ |
| 5 | 150,480 | 719.4 | 959.2 | 5 | K+ |
| 6 | 148,170 | 730.6 | 974.1 | 6 | K+ |
| 7 | 145,860 | 742.2 | 989.6 | 7 | K+ |
| 8 | 143,550 | 754.1 | 1005.5 | 8 | K+ |
| 9 | 141,240 | 766.4 | 1021.9 | 9 | K+ |
| 10 | 138,930 | 779.2 | 1038.9 | 10 | K+ |
| 11 | 136,620 | 792.4 | 1056.5 | 11 | K+ |
| 12 | 134,310 | 806.0 | 1074.7 | 12 | K+ |
| 13A | 132,000 | 820.1 | 1093.5 | 13 | K+ |
| 13 | 132,000 | 820.1 | 1093.5 | K | Transition |
| 13B | 132,000 | 820.1 | 1093.5 | 1 | K− |
| 14 | 129,690 | 834.7 | 1112.9 | 2 | K− |
| 15 | 127,380 | 849.8 | 1133.1 | 3 | K− |
| 16 | 125,070 | 865.5 | 1154.1 | 4 | K− |
| 17 | 122,760 | 881.8 | 1175.8 | 5 | K− |
| 18 | 120,450 | 898.7 | 1198.3 | 6 | K− |
| 19 | 118,140 | 916.3 | 1221.8 | 7 | K− |
| 20 | 115,830 | 934.6 | 1246.1 | 8 | K− |
| 21 | 113,520 | 953.6 | 1271.5 | 9 | K− |
| 22 | 111,210 | 973.4 | 1297.9 | 10 | K− |
| 23 | 108,900 | 994.1 | 1325.4 | 11 | K− |
| 24 | 106,590 | 1015.6 | 1354.1 | 12 | K− |
| 25 | 104,280 | 1038.1 | 1384.1 | 13 | K− |
At position 13, the selector is K and the diagram shows the transition between K+ and K−. The original PDF retains the complete tap-changer connection diagram.
| CT | Class | Terminal / ratio (A/A) | Burden, VA | Technical parameters |
|---|---|---|---|---|
| T1 | PX-B(SPT) | S1–S2: 1000/1; S1–S3: 1200/1 | — | Min. Ek 700 V; max. Ie at Ek 80 mA; max. Rct at 75°C 4.5 Ω |
| T2 | Cl.1 5P20 | S1–S2: 600/1; S1–S3: 1200/1 | 30 | — |
| T3, T4 | PX-B(NG) | S1–S2: 500/1; S1–S3: 1000/1 | — | — |
| T5 | 3 | S1–S2: 1450/2 | 10 | Not stated |
| T6, T7 | 3 | S1–S2: 2400/2 | 10 | Not stated |
| T8 | Cl.1 5P20 | S1–S2: 1000/1; S1–S3: 2000/1 | — | — |
| T9 | PX-B(NG) | S1–S2: 600/1; S1–S3: 1200/1 | — | — |
The winding diagram identifies HV terminals 1U, 1V, 1W and neutral 1N; the two delta windings use 2U, 2V, 2W and 3U, 3V, 3W. The stated vector group is YNd1d1. CT locations, P1/P2 polarity, secondary terminals and OLTC connections are shown in the attached original nameplate drawing.
This GE Grid Solutions three-phase power-transformer design combines a 132 kV high-voltage winding with two 33 kV low-voltage windings, each rated 125 MVA. The supplied documentation identifies the Windyhill BESS project and YNd1d1 connections, with on-load voltage regulation on the HV side.
Rated frequency: 50 Hz. Suitability for a 60 Hz system is not established by these documents. Have the project engineer review frequency, winding configuration, insulation, impedance and protection requirements before selection.
| Parameter | Tap 01 | Tap 13 | Tap 25 |
|---|---|---|---|
| No-load loss at 1.0 Un, kW | 110 (G) | 110 (G) | 110 (G) |
| Load loss at 75°C, 250/125–125 MVA base, kW | 575 (I) | 585 (G) | 850 (I) |
| Total loss including auxiliaries, kW | 695 (I) | 705 (G) | 970 (I) |
| HV–LV1 impedance at 75°C, 125 MVA base | 15.0% (I) | 14.0% (G) | 13.5% (I) |
| HV–LV2 impedance at 75°C, 125 MVA base | 15.0% (I) | 14.0% (G) | 13.5% (I) |
G = designated guaranteed in the manufacturer datasheet; I = supplied for information. IEC tolerances apply to guaranteed values. These are design-document values, not measured factory-test results or a separate Transformer Traders performance guarantee. LV1–LV2 impedance is stated as 26.5% on a 125 MVA base.
The approved drawing identifies a main-tank conservator and air cell, radiator assembly, main-tank Buchholz relay, OLTC protection relay, oil-level indicators, pressure-relief devices, oil and winding temperature instruments, core-earthing terminals, and a control cabinet for cooling units and devices. Lifting lugs, jacking pads, pulling eyes and wheels are also shown.
The drawing identifies a Calisto 2 oil-monitoring device but expressly marks it outside GE scope. Inclusion of this device or other accessories in the sale must be established in the quotation. Cooling is reproduced as ONAN (75%) / ODAN (100%) from the datasheet. The supplied IN WORK nameplate instead says ONAN / ONAF; the final cooling schedule and corrected nameplate remain to be confirmed.
The documented shipping envelope is approximately 9.0 m long × 3.5 m wide × 4.6 m high, at 177 metric tonnes without oil. The complete assembly is approximately 19.6 m long × 7.8 m wide × 8.7 m high, with an approximate total mass of 283 metric tonnes. These are planning dimensions and weights; confirm the shipment breakdown, accessory loads and approved lifting plan before booking transport.
Contact Transformer Traders for current pricing, quantity, location, release schedule and included scope. The project notation PA585-01..02 is a document reference and does not establish the number of units offered. The supplied nameplate leaves serial numbers and manufacturing year unfilled. The transformer is offered new and unused.
Winding connections, secondary options, included accessories, and tap-changer details must be checked against the unit-specific nameplate and drawings. The description above preserves the listed configuration.
Review the transformer procurement checklist, the technical documentation guide, and delivery planning requirements.
Looking for a different unit? Browse new & unused inventory and pre-owned transformers, or ask about additional sourcing options.
Ask our team for the records available for this equipment and confirmation of its current status.
Document availability varies by unit. Pricing, location, lead time, warranty, and delivery scope are provided with the quotation.
Email the equipment ID or call (248) 250-0407. Equipment is subject to prior sale. Current availability and allocation are confirmed in writing.
Yes. We coordinate shipment preparation, oil services, heavy haul, rigging, placement, and qualified installation support as an agreed project scope. Explore full-service solutions.
Terms depend on the equipment, condition, seller, and agreed scope. Review purchase options and request a unit-specific quotation.
All three supplied PDFs are attached in their original form.