New-build power transformers · Sourcing & delivery

New-Build Transformers.
Built for your deadline.

New-build transformers with accelerated delivery options—from 500 kVA distribution requirements to high-voltage power projects. We connect manufacturing access with the plan to get your equipment to site.

3000 kVA transformer at Transformer Traders storage facility.
New manufacturing. Accelerated delivery.

A new transformer.
A shorter path to power.

Source and deliver new-build transformers through Transformer Traders. Put your specification and required delivery date in front of our manufacturing network.

500–7,500 kVA

10weeks

Average build and delivery time

New-build transformers

New manufacturing for distribution and project power requirements. Send your primary and secondary voltages, quantity, and required configuration.

Request this build schedule
10–50 MVA

16–18weeks

Average build and delivery time

Medium-voltage transformers

New-build medium-voltage transformers for substation and industrial projects. Define the voltage ratio, impedance, cooling requirements, and site interfaces.

Request this build schedule
High-voltage transformers

Under 6months

Average build and delivery time

HV new builds

Purpose-built high-voltage power transformers. Submit the MVA rating, winding voltages, application, and technical specification for a project-specific review.

Request this build schedule

Average build and delivery times are subject to specification, production-slot availability, drawing approvals, and delivery location. The quotation confirms the schedule start date, delivery milestone, manufacturer, and included scope.

Distribution equipment / New manufacturing

New-build pad-mounted transformers.

Plan the electrical configuration, manufacturing scope and site delivery together. Transformer Traders sources new-build pad-mounted transformers for distribution, data center and industrial requirements, with the manufacturer and schedule confirmed for each order.

Send the required kVA, primary and secondary voltages, quantity and destination. Include the project specification so we can review the details that affect fit, quotation and production.

Electrical configuration

Specify winding connections, phase, frequency, impedance, tap requirements, insulation levels and any utility or project requirements.

Connections and enclosure

Identify dead-front or live-front construction, radial or loop-feed arrangement, cable entry, terminal configuration, protection and required accessories.

Installation interfaces

Share pad dimensions, cable layout, access restrictions and the receiving plan. Confirm enclosure and connection drawings with the responsible engineering team before manufacturing release.

Wrapped pad-mounted transformers with Transformer Traders branding
3000 kVA transformer at Transformer Traders storage facility.
Plan the complete order

From approved drawings to arrival.

Confirm the approved design, factory testing scope, accessories, shipping release and receiving responsibilities as separate milestones. For staged orders, identify the priority units and the date each batch is needed on site.

The photographs illustrate equipment presentation. Unit ratings, availability, manufacturer and included scope are established in the quotation.

Review new-build build and delivery times
Manufacturer access

The right manufacturing relationships.
A direct procurement path.

Transformer Traders has exclusive access and supply rights through relationships with Eaton, GE Vernova, and other reputable transformer manufacturers. We use that access to source new-build equipment against your technical requirements and delivery schedule.

Built around your specification.

The applicable manufacturer, product configuration, production allocation, and commercial terms are confirmed for each project.

Eaton — Powering Business Worldwide

Distribution & electrical equipment

Discuss transformer and coordinated electrical equipment requirements.

Explore the equipment range
GE Vernova

Power & GSU transformers

Bring your generation, transmission or substation transformer specification to our team for manufacturer review.

Discuss a GE Vernova requirement
Eaton equipment sourcing

From the transformer
to the distribution lineup.

Tell us what your project needs. We’ll coordinate the equipment request, technical review and quotation through your Transformer Traders contact.

Eaton pad-mounted transformer product referenceProduct reference
01 / New equipment

Pad-mounted transformers

Plan your outdoor distribution around the required kVA, voltage ratio, connections and site layout.

Capacity · primary / secondary voltage · quantity

Request pad-mounted transformers
Eaton cast-resin dry-type transformer product referenceProduct reference
02 / New equipment

Dry-type transformers

Review cast-resin and vacuum-impregnated options for indoor electrical rooms and project-specific enclosures.

Insulation · temperature rise · cooling · enclosure

Request dry-type transformers
Eaton Power Xpert XGIS switchgear product referenceProduct reference
03 / New equipment

Medium-voltage switchgear

Build the lineup around your protection scheme. Review gas-insulated and other configurations against the project specification.

Bus rating · fault duty · relays · lineup arrangement

Request medium-voltage switchgear
Eaton integrated facility systems switchboard product referenceProduct reference
04 / New equipment

Switchboards & circuit breakers

Coordinate incoming power, distribution and protection with the transformer package.

Single-line diagram · breaker schedule · controls

Request switchboards & circuit breakers

Busway & bus duct

Map the distribution route, current rating, fittings and connection points.

Discuss requirements

Unit & packaged substations

Bring the transformer, switching and distribution interfaces into one defined scope.

Discuss requirements

UPS & critical power

Specify load, runtime, battery scope, bypass and redundancy for review.

Discuss requirements

Images show example product configurations, not stocked units. Manufacturer, model, certification requirements, production allocation and delivery terms are confirmed in the quotation. Electrical equipment schedules are reviewed separately from the transformer averages above.

From factory scope to site delivery

Speed needs a complete plan.

Define the equipment and the delivery responsibilities together, so the manufacturing schedule supports the project schedule.

01 / Specify

Start with the electrical fit.

Capacity, voltage ratio, winding connections, impedance, taps, cooling, losses, and application requirements establish the design. Coordinate drawings, interfaces, and testing requirements with your engineering team.

02 / Confirm

Secure a defined build scope.

Confirm the manufacturer, available production allocation, approval milestones, documentation, warranty, and commercial terms in the quotation and agreement.

03 / Deliver

Plan beyond the factory gate.

Coordinate shipment readiness, freight, customs where applicable, inland transport, and the receiving plan. Define offloading, final placement, and field-service requirements before dispatch.

Explore delivery and installation support
Manufacturing and delivery milestones

Know what each date means.

Define milestones in the purchase agreement so procurement, construction and receiving teams can plan from the same schedule.

  1. Technical review

    Resolve the specification, drawing requirements, interfaces and any outstanding engineering questions.

  2. Drawing approval

    Confirm the approved configuration and the release conditions for the manufacturing schedule.

  3. Factory release

    Review the agreed testing, documents, packing information and shipment-readiness requirements.

  4. Site delivery

    Coordinate freight, offloading and receipt. Define installation and energization responsibilities separately.

Get a firm project quotation

Send the specification.
We’ll work through the schedule.

For utilities, data centers, EPC contractors, power producers, and industrial facilities: start with what the equipment must do and when it must arrive.

The email button opens your email application. Attach your specification, single-line diagram, or drawings and send to sales@transformertraders.com.

Include these project details

  • Capacity in kVA or MVA
  • Primary and secondary voltage in kV
  • Quantity, phase, frequency, and application
  • Technical specification and required testing
  • Delivery location and required date
  • Freight, offloading, and installation scope

Capacity and voltage are different. A 10 MVA rating describes capacity; the primary and secondary kV values define the voltage requirement.

New-build transformer questions

Clear answers.
Before you commit.

How quickly can Transformer Traders deliver a new transformer?

Transformer Traders provides average build and delivery times of 10 weeks for 500–7,500 kVA transformers, 16–18 weeks for 10–50 MVA medium-voltage transformers, and less than six months for new-build high-voltage transformers. Average build and delivery times are subject to specification, production-slot availability, drawing approvals, and delivery location. The quotation confirms the schedule start date, delivery milestone, manufacturer, and included scope.

Are kVA and MVA voltage ratings?

No. kVA and MVA describe transformer capacity; 1 MVA equals 1,000 kVA. Voltage is specified separately in volts or kV. Provide both primary and secondary voltages with the required capacity so we can review the correct design.

Which manufacturers can Transformer Traders source from?

Transformer Traders has exclusive access and supply rights through relationships with Eaton, GE Vernova, and other reputable transformer manufacturers. The applicable manufacturer, product configuration, production allocation, and commercial terms are confirmed for each project.

When does the delivery schedule begin?

The project quotation defines the starting milestone and the delivery milestone. Drawing approval, commercial release, production allocation, and shipment requirements are reviewed before a firm commitment is made. The published averages should not be treated as an automatic countdown from the first inquiry.

Does the scope include transportation and installation?

Transformer Traders can coordinate factory shipment, international freight and customs where applicable, inland transportation, offloading, placement, and installation support. The quotation specifies which services are included. Site delivery and readiness for energization are separate milestones.

What information is needed for a new-build quotation?

Send kVA or MVA capacity, primary and secondary voltages, phase and frequency, quantity, application, destination, required delivery date, and the available specification or drawings. Include impedance, winding connections, taps, cooling, losses, testing requirements, and site constraints where known.