GE LM2500 — 14 Rebuilt Mobile Generator Packages

Document-based portfolio opportunity: 14 packages, 386.6 MW stated aggregate ISO capacity, 60 Hz and proposed phased delivery in 2027.

Equipment ID: TT-TURB-LM2500-14

Opportunity specifications

Manufacturer / family
General Electric / LM2500
Quantity
14 complete mobile packages, per proposal
Condition
Rebuilt, per proposal; unit-specific acceptance required
Frequency
60 Hz
Aggregate stated ISO capacity
386.6 MW
Configurations
LM2500+DLE, LM2500 Base SAC, LM2500+G4 SAC
Delivery window in proposal
May–November 2027; current schedule requires revalidation
Location / serial schedule
To be confirmed
Pricing
Request a current written quotation
Source proposal effective date
August 4, 2026

Fourteen-package portfolio

The supplied proposal describes an acquisition of fourteen rebuilt mobile gas turbine generator packages with phased delivery during 2027. The fleet combines several LM2500 configurations. Whole-portfolio scope is the stated offering; availability of individual packages or smaller groups must be confirmed.

Portfolio configuration and proposed delivery

QuantityConfigurationStated ISO output eachProposed delivery
4LM2500+DLE29.2 MWMay–October 2027
7LM2500 Base SAC24.2 MWJune–November 2027
1LM2500 Base SAC29.2 MWAugust 2027
2LM2500+G4 SAC35.6 MWAugust and November 2027

The quantities and stated outputs total 14 packages and 386.6 MW. The proposal assigns different outputs to its Base SAC packages; verify each exact configuration and rating from OEM and rebuild records. DLE applies to the identified DLE group, not automatically to every package.

Proposed equipment scope

  • GE LM2500 gas turbine, generator package and mobile power module.
  • Gas turbine assembly, generator coupling, air intake, exhaust and ventilation equipment.
  • Fuel delivery, lubrication package, cooling systems and auxiliary mechanical equipment.
  • Electrical distribution, protection, synchronization and auxiliary power systems.
  • Turbine and generator controls, monitoring, automatic protection and remote communications capability.
  • Available technical, maintenance, inspection, engineering and commercial documentation.

Inspection and performance basis

The proposal cites a representative visual inspection of LM2500 gas-generator components as suitable for continued service, subject to further diligence. That statement is not an acceptance test or condition certification for all fourteen packages.

  • Request the complete serial-number schedule, package inventory and present locations.
  • Review each unit’s operating hours, starts, maintenance history and rebuild scope.
  • Obtain OEM ratings and test evidence for the proposed 60 Hz configuration.
  • Verify fuel requirements, emissions equipment and permitting suitability per package.
  • Establish generator voltage, protection, synchronization and grid-interface requirements.
  • Confirm mobilization, transport dimensions, delivery milestones and site installation responsibilities.

Project applications and staged deployment

The proposed fleet may be considered for utility capacity, independent power generation, data centers, industrial plants, mining, oil and gas operations, peaking or emergency-generation projects. Suitability depends on site engineering, permits, fuel, grid interfaces and guaranteed performance criteria. ISO ratings do not establish delivered net output at your site.

Current quotation and transaction scope

The source proposes phased delivery from May through November 2027. Request the current rebuild status, manufacturing or refurbishment milestones, inspection windows and release schedule. Location is not specified.

Current price, warranty, package boundaries, freight, installation and commissioning responsibilities require a written quotation. Request a refreshed commercial quotation for current portfolio pricing and package scope.