sales@transformertraders.com(248) 250-0407
Home/Generators & Turbines/TT-GEN-LM6000-192282
Supplier-documented opportunity · subject to verification

GE LM6000 PD SPRINT — 46 MW-Class Cogeneration Plant

50 Hz, 11.5 kV LM6000 PD SPRINT cogeneration opportunity, ESN 192-282. Review plant scope, maintenance history, dismantling and inspection requirements.

Equipment reference: TT-GEN-LM6000-192282

Supplier photograph of GE LM6000 PD SPRINT cogeneration plant
Historical supplier photograph · 50 Hz plant · dismantling required.

Equipment at a glance

Model / engine reference
GE LM6000 PD SPRINT / ESN 192-282
Plant output class
Approximately 46 MW; actual site performance to be established
Frequency / generator voltage
50 Hz / 11.5 kV; 60 Hz compatibility or conversion not confirmed
Engine history
2009 manufacture; GE factory-refurbished engine installed in 2021, per dossier
Generator
Brush BDAX 7-290ERJT — 50.8 MW / 63.5 MVA, 0.8 PF, per dossier; distinct from plant output class
Gearbox
Lufkin NFVQ2419-D, 1.209:1 ratio
HRSG
DKME Korea DKS2107H01 — 52 t/hr, 103 barg, 313°C; single-pressure natural circulation
Fuel / combustion
Natural gas plant; triple annular combustor per supplier
Indicative purchaser-facing price
USD 27,000,000 EXW, subject to seller confirmation and final contract
Removal scope
Complete cogeneration plant requiring dismantling
Current location / hours / starts
To be confirmed with current dated evidence
Warranty / shipment schedule
Not yet agreed

Complete cogeneration equipment scope

  • GE LM6000 PD SPRINT turbine and enclosure, Brush generator and Lufkin gearbox.
  • HRSG and two Ariel JGC/4 natural-gas booster compressors. Dossier readings: compressor A approximately 97,280 hours; compressor B approximately 5,800 hours. These are historical component readings, not current engine hours.
  • ABB gas circuit breaker, 4,000 A / 11 kV as described. Reconcile its nameplate, duty and integration against the 11.5 kV generator.
  • Woodward / MicroNet Plus controls and Bently Nevada 3500 vibration monitoring.
  • ABB 800xA v5.1 DCS, ESD and electrical SCADA; virtualized on new hardware in 2023 per dossier.
  • Eagle MERV 17 two-layer inlet filtration with pulse-jet cleaning, upgraded in 2024 per dossier.
  • CO₂ fire suppression, Siemens Oxymat/Ultramat CEMS, hydraulic starter, gas chromatograph and spare-parts inventory as described. Final component schedule must establish completeness.

Maintenance chronology — keep plant and engine hours separate

DateSupplier-recorded event
July 2012Plant commissioned; dossier reports GE CSA maintenance throughout operating life.
September 2017Hot-section replacement at 41,393 package hours.
March 2021GE factory-refurbished engine exchange at 67,853 package hours.
2023–2024DCS virtualization, intake filtration upgrade and HCU replacement.
December 2024GE semi-annual inspection and borescope recorded engine as fully serviceable at that time.

67,853 hours is a historical package reading at the 2021 engine exchange, not the current engine-hours total. Obtain present hours, starts, operating/shutdown status and original maintenance/borescope records. The December 2024 result is historical and does not establish current condition.

Supplier plant photographs

Commercial terms and removal responsibilities

Indicative price: USD 27,000,000 EXW, including the source intermediary’s remuneration, subject to current seller confirmation, final scope, satisfactory inspection and definitive contract.

Dismantling, packing, loading, transport, insurance, import charges, installation and any frequency conversion must be expressly allocated and separately priced where not included. All plant components require dismantling. Warranty/as-is terms, price validity and a binding shipment schedule have not been agreed.

This is a 50 Hz plant. Do not assume 60 Hz compatibility. No deposit amount or payment milestone is established for this position; any payment schedule must be agreed in the final contract.

Technical review, inspection and purchase

  1. Send the purchasing legal entity, project country, required frequency, delivery target and nominated technical reviewer. Confirm that a 50 Hz complete cogeneration plant fits the project.
  2. Establish confidential buyer registration, applicable confidentiality/non-circumvention documents and intermediary fee protection before an authorized introduction. Review the actual documents before signing. Funding verification follows an agreed confidential qualification process.
  3. Obtain current dated proof of existence, equipment identity, present operating or shutdown status, ownership or authority to sell, and the final equipment schedule before travel or a deposit commitment.
  4. Agree inspection access, site contact, dates, safety requirements, permitted photographs and tests, independent inspector and travel costs. Reconcile nameplates, component serials, preservation and maintenance records. Running tests or additional borescope work require specific authorization.
  5. Following satisfactory diligence, agree technical acceptance, title transfer, final scope, warranty/as-is terms, delivery obligations and protected payment instructions in the definitive contract. An inspection is not unconditional purchase acceptance.

Source and verification status

Original two-page supplier dossier available through the confidential qualification process. The opportunity comes through supplier/intermediary channels, not a verified direct-owner mandate. Confirm current proof of existence tied to ESN 192-282, ownership or authority to sell, final scope and inspection access before travel. This is separate from the LM2500 offerings.